Tier 2 is mandatory now. Tier 3, full measurement-based MRV, is the end state operators have until January 2027 to reach — here is what stands between the two.
Nigeria's upstream sector is mid-transition on a single regulatory directive: the move from calculation-based to measurement-based greenhouse gas and methane reporting. Tier 2, calculation-based reporting against NUPRC's standardised templates, became compulsory in Q3 2026. Tier 3, full measurement-based Monitoring, Reporting and Verification (MRV), is the requirement from January 2027.
Full MRV means every reported figure is backed by metered, continuous measurement rather than emission-factor estimation. In practice that spans four sources: flared gas volume (metered per source, daily, via a licensed provider), vented gas volume (deliberate venting quantified, cold venting prohibited without a waiver), incomplete-combustion and fugitive emissions (unburned methane from flares plus component-level leaks found through half-yearly LDAR / optical gas imaging surveys), and production-and-reconciliation data that ties volumes out so the whole picture is auditable.
Seven distinct obligations, on four different cadences, converging inside a six-month window. For a team running this in spreadsheets, that is a permanent monthly scramble reconciling meter readings, lab composition data and production records by hand, then rebuilding NUPRC's templates from scratch each cycle. The accuracy problem compounds at the measurement layer: methane is reported as CO₂-equivalent using its Global Warming Potential, roughly 28 times CO₂ over 100 years, so a small metering or composition error on vented gas swings the reported tonnes materially. This is the specific gap DeltaTru's Tier 2 and Tier 3 workstreams are built to close, on the systems an operator already runs.
Sources: NUPRC Directive on Standardised Templates & Measurement-Based Methane/GHG Reporting (2026); NUPRC Guidelines for Management of Fugitive Methane & GHGs (Nov 2022); Petroleum Industry Act 2021, §104 & §108. Not legal or compliance advice — confirm current obligations directly against NUPRC's published directives.
A structured review of your current operations against this module's requirements, delivered as a gap report and costed pathway, not a sales call.